Hi
Having to connect Soil pipes to existing clay I am restricted as to the height adjustment on a house extension, a meter or two would reach the height of the Insulation, a brickie friend has adviced me to forget the screed and float/trowel finish with 125mm concrete, would the BI allow this or would no harm in part of pipe within the Insulation? help please