Hi everyone,
I am looking at knocking through 2 reception rooms into one, i have been advised that regulations recently changed and the maximum gap i can have is reduced because there is an existing arch in the hall way next to it. Its a load bearing wall.. i have drawn the layout below.. kind of! Does anyone know what the max opening i can have is?
]
]
door to rec 2
rec2
-----(wall i want to remove) -----------------]/----------\ <------archway over stairs
door to hall |
|
] |
rec1 ] | <--wall to adjoining house
] |
] |