Conservatory base built delay on frames

Posted: Sat Dec 05, 2020 3:14 pm
by TuThis
Hi

Just found this website so need some advice if you can.

We have had a conservatory base built 7m width 3.5 depth, its all been completed, I dont know much but base was laid, then some gravel and then concreted over.

The dwarf walls have a gap in between where insulation was inserted, the floor had this inulation as well but it was like huge pads.

Black membrane on the ground etc all seems ok as far as what I can see,

They are a big company but one thing that im wondering is...

Frames/glass can be delayed until January and everything is getting we.

Now is this not an issues and the floor is concrete and the insulation in the walls has been covered, just that the water is gathering, I keep sweeping it out which is fine OR do I have anything to worry about with this delay.

Thanks

Re: Conservatory base built delay on frames

Posted: Tue Dec 08, 2020 9:58 pm
by stoneyboy
Hi tuthis
Probably nothing to worry about just continue to remove accumulated rainwater.
Regards S