?? -+- DPC Tray & Weepholes -+- ??
Posted: Mon Apr 07, 2008 9:54 am
Hello,
I am building a workshop extension and I am almost up to DPC level and ready to fill the cavity with lean mix concrete to ground level but a friend told me that I should have installed a Cavity Tray below the DPC with weep holes to drain any water from the cavity. There is nothing on the plans that mention this but I need to install a methane gas barrier and the installation notes for this do show the membrane being fitted to the inner leaf at DPC level with a cavity tray down to the outer leaf to just above ground level so I'm now worried that I may have to demolish several courses to fit the cavity tray and weep holes.
Any help/advice will be very welcome.
Lee Hewitt.
I am building a workshop extension and I am almost up to DPC level and ready to fill the cavity with lean mix concrete to ground level but a friend told me that I should have installed a Cavity Tray below the DPC with weep holes to drain any water from the cavity. There is nothing on the plans that mention this but I need to install a methane gas barrier and the installation notes for this do show the membrane being fitted to the inner leaf at DPC level with a cavity tray down to the outer leaf to just above ground level so I'm now worried that I may have to demolish several courses to fit the cavity tray and weep holes.
Any help/advice will be very welcome.
Lee Hewitt.