Page 1 of 1

Hollow block work on 45 Degree slope.

Posted: Sun Jun 19, 2022 8:59 pm
by DaveySeagrave
Hello,

I'm building a in ground pool, with a deep and a shallow end.

The transition between the deep and shallow end with be around 45 degrees. How do I go about laying the rebar reinforced hollow concrete blocks up the slope?

As far as i can see i would start at the bottom and work up. Cutting down blocks to fill the voids.

Look forward to a response