Hello All
First post so dont all shout (or laugh too loudly )
I want to dot and dab walls in upstairs bedroom.
I have already boarded the ceiling and have 2.4m x 1.2m tapered edge 12.5mm boards to do the wall.
Problem is my ceilings are 2.6m from floor to ceiling ie. leaving a 200mm gap if I apply a full board.
How do I get round filling in that 200mm gap ?
Is it a case that I apply the full board and then cut out 200mm strips and add them on top (with the intention of applying scrim tape and gett boards skimmed ) or what ?
I so wish I had employed a builder who could use a tape measure !