Hello all,
I really need some advice having never attempted anything like this before.
I am attempting to build a 28m² patio and so far I have:
Dug out soil to 150mm
Added 5 tonnes of type 1 MOT sub-base
I still need to add another tonne but I'm worried about levelling (with the drop) as the size of the grains are so large (pic 5). Should I order a type 2 MOT instead of a type 1 before compaction?
Also, what's the best way of levelling it? Pegs or stringline? I can't seem to find much guidance for this part.
Thanks in advance.
https://i.imgur.com/6qZJbzc.jpg
https://imgur.com/J5pz4AM
https://imgur.com/mLDWCzu
https://imgur.com/Vl6GPmt
https://imgur.com/6qZJbzc