by crofter »
Mon Aug 06, 2007 11:28 pm
I need to lay a 9m x 6m base for a shed. I will use readymix delivered by lorry. Since it is too wide to span with a tamping batten should I lay it in sections and, if so, how do I separate the sections without leaving formwork set in the concrete?