by silver7 »
Tue May 15, 2007 12:35 pm
Thanks for relpying so quickly. We have all the planning and building consents. It is interesting that you say the membrane has to be 150mm above ground level as the building inspector is OK for the first membrane to be laid directly on to the garage floor, which does not appear to be above ground level, hence our concern with the 4 by 2 timber frame going straight into the ground and water getting through underneath.