Hi everyone,
I really need some advice I have a studio outside, some of which is on solid slabs, the other half is just concrete my ex husband use to have a pond in that section and fill it in when we built my ceramics studio, some of the concrete has broken up and I can now see a hole I put a stick down it approx 6ft and the stick never reached the bottom, I can see some block work however it appears there is no concrete holding to together only earth which is now falling down in between the block work that is visible, the top layer of concrete is only 1/2inch thick.
Should I smash it up and fill with concrete or can I drill holes and just pour concrete in unit it stops.
Hope you can help
Rachel