Hello,
I'm building a in ground pool, with a deep and a shallow end.
The transition between the deep and shallow end with be around 45 degrees. How do I go about laying the rebar reinforced hollow concrete blocks up the slope?
As far as i can see i would start at the bottom and work up. Cutting down blocks to fill the voids.
Look forward to a response