I have a conventional oil-fired boiler system providing hot water and central heating. It is controlled by a "Y" plan, incorporating a motorised mid-position valve.
I wish to add wet under-floor (UF)heating in the bathroom and I understand that the conventional way of incorporating this would be to remove the existing valve and convert the system to a three zone-valve "S" plan, which sounds rather wasteful. Could I instead add a second mid-position valve in series in the existing system, so that the first provides UF heating and/or everything else and the second provides CH and/or hot water?