by the specialist »
Sat Jan 10, 2009 2:52 pm
hi jamjo,
If the property has been empty for 5 years and presumably unheated it is quite likely still damp. I would carry out a strict heating and ventilation regime to dry out the building. Your flaking paint could quite simply be due to internal condensation over a long period of time. A lot of people believe that only occupied buildings suffer from condensation quite wrongly. All buildings contain moisture and are also affected by changes in temperature due to climate changes throughout the year.
If the plaster appears sound and is not crumbling and the wall is dry you should be able to sand off and repaint. Check the wall with a moisture meter.
Aidan