I recently had all our walls skimmed in our flat. The plasterer advised to leave for 4-5 days before doing anything with the wall. About 8 days afterwards i coated the walls with watered down PVA glue. after a day or so I gave it its first coat of matt emulsion, then once dried gave it a second coat. I then left it for about 2 weeks. When I applied the 1st coat of the colour, one area of a wall has started to bubble when the roller applies pressure to it.
I now realise that this is because that section of the wall never dried properly. I have stripped most of the area down to the new plaster. what is the best way to acheive a seamless finish? would I have to strip that whole wall?
please advise , im stuck