bathroom Vent Pipes for new Bathroom Build
Drainage and wastage systems and plumbing help, advice and answers

2 posts   •   Page 1 of 1
robert10185
Labourer
Labourer
Posts: 1
Joined: Tue May 08, 2018 5:52 am

bathroom Vent Pipes for new Bathroom Build

by robert10185 » Tue May 08, 2018 6:22 am

I am building a bathroom in my room addition,my drain pipes are all running together. I have a shower , tub, double vanity and a toilet. There is a 3 inch vent pipe behind the toilet drain and a 2 inch vent pipe off the shower drain.Do I need to run a vent pipe for the tub and vanity or will the two I have work for the whole system?

RoyalBathrooms
Labourer
Labourer
Posts: 2
Joined: Tue Jun 12, 2018 10:50 am

Re: bathroom Vent Pipes for new Bathroom Build

by RoyalBathrooms » Thu Jun 28, 2018 12:37 pm

I think the 3 inch pipe is enough for both drainage system. The 3 inch vent pipe can hold all the wastes and can easily move it to the waste area.

2 posts   •   Page 1 of 1
It is currently Thu Dec 05, 2024 2:55 am