Hi,
We're going to be adding a shower to our bathroom and thought we'd have a crack at the installation ourselves.
Although we'd rather entrust the plumbing and electrical work to someone who knows what they're doing, we'd like to do the tiling and fix the unit.
We're having a mixer shower with pipes independent of the bath taps, and a pump installed.
Question is:
do we tile first then drill through for the pipes, or do we make the holes first then try to cut the tiles fit around the opening?
It might sound silly but we're new to this. :oops:
Thanks