I am having difficulty getting a second quote for lead sheeting a dormer window and was hoping someone could confirm whether the quote I have is in the right ball park?
The new dormer is 2.7 m deep , 2 m wide and 1m high. On a stone slate roof.
6 sq m of lead on the roof code 8.
2 sq m in the cheeks.
Two rolls to the top and soakers etc
Have been quoted £2900 inc. materials and labour
Any ideas if this is about right?