Conservatory base built delay on frames
Conservatories are a great all-round addition to any home. Find help, advice and information on all aspects of this area.

2 posts   •   Page 1 of 1
TuThis

Conservatory base built delay on frames

by TuThis » Sat Dec 05, 2020 3:14 pm

Hi

Just found this website so need some advice if you can.

We have had a conservatory base built 7m width 3.5 depth, its all been completed, I dont know much but base was laid, then some gravel and then concreted over.

The dwarf walls have a gap in between where insulation was inserted, the floor had this inulation as well but it was like huge pads.

Black membrane on the ground etc all seems ok as far as what I can see,

They are a big company but one thing that im wondering is...

Frames/glass can be delayed until January and everything is getting we.

Now is this not an issues and the floor is concrete and the insulation in the walls has been covered, just that the water is gathering, I keep sweeping it out which is fine OR do I have anything to worry about with this delay.

Thanks

stoneyboy
Project Manager
Project Manager
Posts: 6537
Joined: Wed Dec 10, 2008 6:44 pm

Re: Conservatory base built delay on frames

by stoneyboy » Tue Dec 08, 2020 9:58 pm

Hi tuthis
Probably nothing to worry about just continue to remove accumulated rainwater.
Regards S