Hello
I'm laying a small (3m x 3m ish) patio with square 45cm slabs, will also surround with rounded (&deeper) 60cm edgers too.
Simply should edgers be laid before, after or same time as slabs are laid?
Was thinking of either laying patio in full, then surround with edgers
Or
Lay 1 length of edgers, start patio against this length & lay edgers gradually after enough slabs are laid create length.
Thanks in advance,