I've demolished our old garage which has an inspection pit.
The bottom is below the water line and in wet weather a pool of water forms.
I want to fill it with the blocks from the garage and then pour cement to the top six inches so it's level with the floor.
I have three questions:
1) Do I need to drill holes through the base of the inspection pit to prevent water pooling or can I just fill and forget?
2) What's the consequences of filling without drainage?
3) Can I lay the blocks down whole filling the gaps in with rabble or is it best to compact the blocks to reduce the gaps?
Thanks in advance