Confirmation help please - Supplementary bonding

by DT » Thu Oct 18, 2007 4:40 pm

Hi could anyone please confirm the correct supplementary bonding...

All pipework (bath, shower, sink, toilet, radiators) copper within the bathroom but changes to all plastic beneath the floorboards.

Electrics within the room are:
* Pull dimmer switch to downlights [located in unzoned area]
* Shaver socket (off light circuit) [located in zone 3]
* Bathroom mirror light (off light circuit) [located in zone 3]
* Pull light switch to shower cubicle [located in zone 3]

I don't think any supplementary bonding is required - but please correct me!

Any help appreciated.

BLAKEY1963
Site Agent
Site Agent
Posts: 684
Joined: Wed Jun 13, 2007 11:57 pm

Re: Confirmation help please - Supplementary bonding

by BLAKEY1963 » Fri Oct 19, 2007 12:48 am

[quote="DT"]Hi could anyone please confirm the correct supplementary bonding...

All pipework (bath, shower, sink, toilet, radiators) copper within the bathroom but changes to all plastic beneath the floorboards.

Electrics within the room are:
* Pull dimmer switch to downlights [located in unzoned area]
* Shaver socket (off light circuit) [located in zone 3]
* Bathroom mirror light (off light circuit) [located in zone 3]
* Pull light switch to shower cubicle [located in zone 3]

I don't think any supplementary bonding is required - but please correct me!

Any help appreciated.[/quote]

DT
4 mm2 earthing conductor between shower pullcord switch and lightswitch only required.
BLAKEY1963

DT
Labourer
Labourer
Posts: 2
Joined: Thu Oct 18, 2007 4:34 pm

by DT » Fri Oct 19, 2007 8:47 am

Cheers Blakey, your confirmation much appreciated.