I am extending my house with a 2 storey increasing kitchen/dinning and adding extra bedroom and a bathroom. This will give me a big house with 5 bedrooms. The current house has central heating etc. Although my builder will be doing the plumbing I want to make sure I have the right system correctly installed. I will be buying new boiler and cylender. I have been advise to go for 33kw Boiler and 210 L main fed cylender. Can someone advise if:
1) Is it ok to fit the new system to the current system (I think the current one has 10mm pipes)
2) It's ok to use plastic pipes rather than copper?
3) My builder says I should go for 10mm plastic pipe otherwise he will have problem with plastering. Is he right or should I go for 15mm.
Any advise will be welcome. This extension has given me a lot of headace with things going wrong. Thanks.