Hello,
I have been under the floor boards and found that I have a 22mm pipe with a 8mm manifold off of it on both the feed and return. The 22mm pipe is also tee'd at the boiler to feed the 8mm manifold upstairs.
At present upstairs the manifold serves 3 rooms
downstairs manifold serves 5 rooms.
the down stairs has a cap on an unused outlet in the manifold.
can I uncap this and run another radaitor?
If I can what do I need to hook the 8mm pipe to the manifold?