Hi all, I've bought a 1904 detached place which had slipped at the front and was underpinned - Had the structural engineer go over the place and its fine. I am however left with all the first floor rooms slopping towards the front of the property. As I intend to replace all the ceilings and replaster all the walls, can i use use bottle jacks and acro's to lift the joists then pack underneath them? And just to make it interesting, the front room ground floor rooms are suspended - does this effect anything in terms of lifting the joist?
Thanks
Any help advice tips etc much appreciated.