I want to replace my bathroom radiator with a towel radiator and will need to alter the pipework. I am reasonably ok with soldering fittings etc but is it ok for a novice to work on a sealed system (no tank in loft or h/w cylinder)? I have read of problems with boilers/c/h after work has been done and am a bit wary.
Assuming it's ok for me to do, is it better to drain and refill the system or use a pipe freezing kit. Obviously I will use push fit fittings if it is better to freeze the pipes.
Thank you