I wonder if someone could answer me a basic question on plumbing.
I am changing a bath suite. The pipework doesnt have isolation valves. We have a combi boiler and I need to know what the procedure would be to stop the water and install my new bathrom suite. I have heard lots of horror stories on sealed systems and pressures etc.
Does someone have the proper procedure to ensure I do not ruin my boiler in the process???
many thanks