by ALDA »
Tue Mar 25, 2008 5:35 pm
ALAN,
THE BUILDING CONTROL INSPECTOR WILL WANT TO VEIW THE FOUNDATION TRENCH BEFORE THE CONCRETE CAN BE POURED FOR THE FOUNDATIONS.
SO I THINK HE WILL TELL YOU TO REPOSITION DRAINS AND INSPECTION CHAMBER BEFORE YOU CAN PROCEED AND HE WILL WANT TO VEIW THIS ALTERATION TOO.
(BUT MAY REQUIRE NEW/ALTERED DRAWINGS SUBMISSION TO PLANNING AND BUILDING CONTROL).
EASIEST WAY OUT IS TO REDUCE THE FOOTPRINT OF THE PROPOSED EXTENSION.
(THIS MAY REQUIRE NEW/ALTERED SUBMISSIONS TOO.
THIS MAY NOT BE WHAT YOU WANT TO HEAR.
ALDA.