by htg engineer »
Fri Apr 25, 2008 2:26 pm
After the powerflush, the system should have been filled and flushed again if any chemicals were used during the flushing process.
Also after the powerflush inhibitors should have been added to the system, was this done (i bet not) ?
have you drained the system since the new boiler and radiators were installed ? if so then the inhibitor should have been renewed. There should be a sticker on the boiler to say what date the inhibitor was added.
You have to replace the inhibitor everytime you drain the system.
Hope this helps