Hi, please could someone help? Our tiler has attached most of the tiles, then my daft husband paid him and he has never been seen again, leaving us with downpipes to be attached, tiles to be hung on the top rail, and also where the scaffolding came down!
But the main problem is the downpipes, do we drill through the tiles and on the batten or to the wall behind that? Alos how do you drill safely through tiles?
Thanks for reading, and am hopefull for advice..