i have dug up the front garden to expose the mains water pipe as its lead, reason being is the siezed stop cock is level with the floor and welded to the lead pipe meaning i need to change it from the meter.
i have dug up withing a few inches of the meter and found they have a plastic 25mm pipe coming about 8 inch off the meter then into a universal coupler to my lead pipe.
so i know that i need 25mm blue MDPE pipe, and also know i can reuse the coupler as thats been off today to check its condition.
i am wondering what sort of fitting is required where the new pipe is going to come into the house.
i have done a slight reroute as the existing pipe runs to the fornt of the hosue then bends off up the side where its to hard to dig out, so i have drilled through into the space under the living room floor and will be running it through there and up into the kitchen..
so my question is, what connections do i require, ie what sort of stop cock and what connector to get it to copper pipe after that.
am i best going 22mm up to where it will tee off to the heating, toilet and bathrooms ? or 15mm all the way ?
thanks in advance.