by sparx »
Wed May 16, 2007 6:11 pm
Hi Owen,
Not going to be easy to explain but you may find helpful drawing in 'projects' You cant run from sw. position as no neutral there,
If loft access then best way is to run tw/e from existing light ,connecting to N, E, & looped live, to a 6 term J.Box.
Run new 3 core & earth from switch position to Jbox, @ j box connect perm. live to 3cores brown core,
at switch connect brown to both Commons of two new switches, connect black to L1 on 1 sw. & grey to L1 of other sw. (both should be sleeved with brown sleeving or tape to show sw. lives.
existing pair go to 3rd sw, C & L1
will post more abt connecting lights to J box later got to go out....