[quote="htg engineer"]There's alot of work to fit a boiler in the loft :
-You need lighting installed (not temporary lights)
-loft floor needs to be boarded at least a walkway and an area around the boiler
-Fit handrails around the loft hatch
-Have loft ladders installed (can't use step ladders for access)
-You need an electrical socket near the boiler, for testing equipment etc.
-There has to be an ECV fitted to the pipework before it enters the loft.
etc etc.
As for the pipework - i'd go for copper everytime.
htg[/quote]
Thanks for the reply
Nothing sounds too difficult there.
I have a fixed pull down loft step ladder, is that ok?
Already light, floor boards and electric sockets in the loft so thats fine
And can fit hand rail round inside of loft hatch easy enough.
Why do you say use copper? It's more expensive harder to work with and longer to fit.
Thanks for the advice