have downstairs cleakroom and have re-arranged to placement of wc and sink.
the waste pipe for the sink has been positioned under the concrete floor that the builder dug up.
question 1
is this right?
what happens if need to change the pipe at sometime
I thought the pipe should be above ground level going out of the wall to the manhole
any help appreciated