Hi I have just removed a window and replaced it with a patio door, the internal reveals now need tidying up. The cavitity at floor level is now open, due to the fact I needed to cut down from window to floor to fit in door, does this need to have a DPC before I fill in and plaster up? and if so what would be best method?
Regards
KB