by htg engineer »
Mon Jan 26, 2009 4:49 pm
It'll work, but two pipe systems are preferred.
Personally - I would upgrade to a two pipe system.
New pressurised boiler, old pipework and old rad valves aren't a good combination, for a few reasons - prone to leak, any sludge etc off old system will block the waterways of the new boiler if not flushed properly.
New boiler, new pipework and new radiator valves = no leaks, no sludge etc.
htg