I've moved my bathroom upstairs and relocated a light fitting.
Replaced the pendant rose with a junction box and fitted a cable to the new light mounted on the wall above the sink. Everything has been routed through the new stud wall.
I haven't 'buttoned up the stud wall so it can all be inspected, but everything is pretty much on a like for like, except the new cable to the light fitting.
Do I need to inform local building control of the work that has been done? And is it going to cost a fortune?
Cheers
James - Southampton