I am your typical Joe Public, I can read about gas boilers and systems etc and then ask the Gassaferegister listed person to come and look and give me a quote for the work required. It is ME that pays the bill.
Installer A looks at the gas feed pipe from meter to boiler-10m distance-with take off for gas hob, and says that the present 15mm copper pipe will not do because it won't carry enough gas pressure and will need a 22mm pipe.
Installer B looks at same pipe and says that the concrete rendering over the Victorian brickwork that uses the 15mm copper pipe as an edge/finish line, about 8 inches above ground level, will not do as rendering corrodes the copper and will not get signed off. Rendering has been there for 20 yrs.

A said nothing about this rendering and B said nothing about gas pressure.

This Joe Public is now confused by the comments/non-comments of two registered, qualified installers.
Are they both correct , but missed a bit or what !!!???

Comments please.

Brian

Think this is the best page to ask .

htg engineer
Project Manager
Project Manager
Posts: 3256
Joined: Tue May 22, 2007 6:22 pm

by htg engineer » Mon Apr 06, 2009 5:47 pm

They are both correct.

Maybe installer A didn't mention the rendering because - as he says the 15mm pipe is no good, and would have to be upgraded to 22mm - so the 15mm pipe will not be used and if it corrodes it wont matter.

Maybe B has said he cannot leave the pipe in because the rendering will corrode the pipe, if you said ok replace it - he may have said ok i'll replace it in 22mm ?

Really you will have to ask them - but they are both right, unprotected pipework will corrode and 15mm pipework is no good to feed a boiler and a gas cooker - 22mm would be the minimum size - 28mm if a longer run.


htg

Steve the gas
Site Agent
Site Agent
Posts: 780
Joined: Sun May 04, 2008 8:07 am

by Steve the gas » Tue Apr 07, 2009 5:53 am

Ditto