by sparx »
Sat Jun 02, 2007 7:58 am
Hi agn.
I have never installed this set up but have read blurb abt it, you will need 45A double pole sw, as for showers, cookers etc & deepest box you can get to mount it on as 6mm not very flex. don't know abt cable to main heater but would imagine it comes with a short length of suitable heat resistant cable fitted.
Immersions will need two fused spurs wired one from each mains consumer unit, the hofr is heat resistant flex agn. sold by the meter for the purpose, made of butyl rubber, usually white (& gets dirty very easily
)
Standard con. unit with MCB's between £45.00 & £100.00 each depending on how large, RCD fitted etc, Leckie should charge around £200/day-£30/Hr. plus cost of certs, registering work, (on line to approving body/bldg cont) plus any other bits he might use