I am re-installing a shower tray and enclosure in an upstairs room. In the past there has been a small leak which has affected a wall in the downsatirs lounge.
In order to avoid future leaks I am going to embed the tray into two sides of the three walled sides (other side will be a showe door). On the third wall there will be a gap approximately 5 inches wide which I plan to fix some sloping tiles to but upto the exposed side of the tray.
I am not sure how best to firstly fill the 5 inch gap (around 6 inches deep) and then fix the tiles. I am nervous that this are might be more likely to leak in future.
For information I have built a stand for the tray using 4'' x 2" and 0.75" plywood.
Any help would be most welcome.
Thanks
Ray