by thedoctor »
Thu Jun 07, 2007 8:10 am
You can either get a plumber to move the pipes. Box the pipes in and put the unit onto the box (see our boxing in pipes project) or cut the back of the unit to accept the pipes and, if necessary, move the back panel of the unit forward by putting some new battens around the internal perimeter of the unit and fixing the back panel to them.