Some of you may be familiar with my builders by now, I've come across another issue.
When installing a shower they chased the pipework into the back of the wall to avoid disturbing the tiles. However they have not sheathed the pipe in larger diameter pipe or even clipped it in place before plastering over it. Is this a BC requirement or just recommendation to avoid the paster cracking?
The pipework knocks something chronic when we turn the shower on and the inevitable has now happened with the top of the hot pipework chase cracking round the edge (clearly visible as it has now been painted).
Before I get the builders back I wonder if you could please advise if I should get BC involved again or just leave it to the builders? Should they be taking it out and putting a sheath in place or would opening the chase at top and bottom and every 50cm along it to allow a saddle clip to be installed be sufficient?
Thanks
Adrian