I’ve read the project on fitting a PRV to reduce the mains water pressure into a mixer shower so it matches the tank fed hot water pressure. The PRV suggested only goes down to 1 bar output pressure, with a 3m hot water head I believe this gives me 0.3 bar pressure on the hot, will the difference between the hot & cold pressures into the mixer shower matter, or do I need to find a PRV that will go down to 0.3 bar output?
Thanks
Rod