Existing 22mm Gas pipe is earthed correctly I hope about 50mm from the gas meter outlet and goes unbroken to the main earth on electric meter board
A new gas boiler located in a new position will entail another 22mm gas pipe teed from the gas meter outlet and run to the new boiler position
The existing gas system and its earthing will remain as is to supply a gas fire
Question is it required to run a second earth wire along with the second gas pipe to the main earth point.