Hi
I intend to damp proof a garage floor using a liquid waterproof membrane as suggested in the projects. However the floor needs levelling as well
using a levelling compound.
In which order should this be carried out, level first then waterproof membrane (liquid), or level after the application of the waterproof membrane.
Thanks
Bi