by sha99 »
Tue Jan 05, 2010 6:18 pm
i am getting a low level access tray and shower fitted.the waste pipe from the tray comes through the kitchen ceiling and paralell to the joists to get to the soil pipe.is this common practice as my new kitchen was fitted b4 christmas and am worried about a waste pipe running above new units