by thedoctor »
Fri Jun 15, 2007 6:08 am
The tube running to the pipe should be sleeved with a bigger pipe ( 15mm pipe should be sleeved with 22mm and 22mm should be sleeved with 28mm) to avoid as much contact as possible with mortar/plaster to water carrying pipe. The pipe should be clipped to the wall every metre if teh run is long enough. Taps and clips can be fixed directly to wall using our fixing to masonry project.