Hi all, I have just read today that concrete lintels are pre stressed. On watching my builder last week, he took a 2m concrete lintel and cut it in half to go over a sewer pipe before he built a 2m high cavity wall on top of the lintels. He did leave approx 150mm over both sides of the footings to bear the weight. Will these lintels be ok as they are now cut or will they just crumble.
All comments are much appreciated
cheers
andy