by jackhawk »
Mon Mar 29, 2010 5:55 pm
Hi Karl, no such thing as a silly question. I know!! If you are going for a split load CU you want two RCDs for each side. EG: All your down stairs circuits and lights up, and all your upstairs circuits with lights down. 30mA RCD at the start of both splits. Get a CU that is pre wired, saves a lot of messing about. Most are and can work out cheeper.
Regards
jackhawk