I have a valley or gulley between two roofs set at 90 degrees. The sides of the gulley are finished with cement(?) which is now breaking away and needs pulling out and re cementing (re-pointing?).
Do I use a normal morter mix or if not what mix should I use?
The house is a bungalow and access is straight forward.