by Masterpop »
Fri Nov 12, 2010 10:40 am
Thank you chaps.
The rational for fitting one was simply that my house needs quite a lot of electrical work which will occur over a long period of time (say 1 year, during which time I would need to isolate the main supply 2x I reckon, potentially just the once with some planning), so rather than rely on the DNO to come take out the main fuse and re-seal as needed I thought it would make sense to fit a main isolation switch. However, when I spoke to DNO, they said they were happy with the electrician to take out the fuse and asked that they be contacted when work is finished so they can come and re-seal it. at which point i thought maybe an isolation switch is not that necessary.
Your point on where to place it is interesting, you're right, after the meter, before the CU makes more sense. the way my installation is, physically between head and meter is more convenient.
Thank you